Type U 3

Home / Type U 3

p069_1_01

Type U 3 (“Germania” U-Boats)
U 3 and U 4= 2 U-boats

 

These two U-boats were ordered on 12 March 1907 at the German Germaniawerft at Kiel as double-hull vessels, launching took place on 20 August, respectively 20 November 1908.

After U 3 became the first submarine of the Austro-Hungarian Navy that reached the status of “launched”, it left the German shipyard on 29 December 1908 and transited to the Mediterranean with tug assistance, to reach Pola Naval Base on 24 January 1909. U 4 left the shipyard on 25 March 1909, to reach Pola on 19 April 1909. U 4 was commissioned on 29 August 1909 and U 3 on 29 September 1909, which means both vessels came into service earlier than the “Lake” U-Boats U 1 and U 2, which were put on order well before the “Germania” U-boats. Also, U 4 was the first U-boat ever commissioned by the Austro-Hungarian Navy.

 

Year of construction

1907-1909

Shipyard

Germaniawerft at Kiel

Displacement

240 t/ 300 t submerged

Length

43.2 m

Beam

3.8 m

Draught

2.9 m

Propulsion

2 Kerosene engines, 2 electric engines, 2 propellers

Engine Power

600 HP/ 320 HP submerged

Speed

12 kn/ 8.5 kn submerged

Range

1,800 nm at 8 kn/ 30 nm at 3 kn submerged

Diving depth

30 m

Fuel

10.73 cbm

Armament

2 bow torpedo tubes, 1×3.7 cm gun, 1×7 cm gun

Complement

21